comcheck inspection checklist

These documents will also contain important information and the fees associated with each permit and license. endstream endobj 340 0 obj <>/Subtype/Form/Type/XObject>>stream %R@PBL1X Kh . wall area, gross: the area of the wall measured on the exteriorface from the top of the floor to the bottom of the roof. COMcheck Desktop for Windows may be downloaded and installed directly to your desktop. Owner, project engineer, contractor, date of construction. f 2022 New York City Mechanical Code. Additionally, a bond is required for sidewalk/culvert/driveway permits. %R@PBL1X Kh Ryan did an outstanding job with walking me through the home and outside post his hole inspection. %R %PDF-1.7 % H23U0t.=s#0ag /Tx BMC The problem most likely relates to the basement walls you have specified. f (D) COMcheck versions. The ASHRAE Appendix C trade-off method does include a limited number of embedded references to ASHRAE 90.1 based prescriptive requirements that must be enforced. Cavity insulation is used within the wood- or metal-framed wall, while rigid continuous insulation (c.i.) Listed below are some links, documents, and . View a list of supported software versions for code compliance tools. endstream endobj 352 0 obj <>/Subtype/Form/Type/XObject>>stream endstream endobj 331 0 obj <>/Subtype/Form/Type/XObject>>stream H23U0t.=s#0ag endstream endobj 371 0 obj <>/Subtype/Form/Type/XObject>>stream %R This section shall only be used where the equipment efficiencies in Tables C406.2(1) through C406.2(7) are greater than the equipment efficiencies listed in Table C403.2.3(1) through 403.2.3(7) for the equipment type. requirements of the current Indiana Energy Conservation Code (675 IAC 19-4) (COMcheck reports must be run with current software, must show passing performance and must include the accompanying Inspection Checklist Report, which must report a score of no less than 100%); 416 0 obj <>/Filter/FlateDecode/ID[<3003002851D2A845A6F40040E0F40574><9AD711DF5867354796DDAB8B7662C071>]/Index[320 153]/Info 319 0 R/Length 159/Prev 229760/Root 321 0 R/Size 473/Type/XRef/W[1 3 1]>>stream Support for the 2018 and 2021 IECC, as well as future codes, will only be available in REScheck-Web as eventually the Desktop version will become unsupported. %R The Scope and Application sections of the 2009 IECC address use of ASHRAE 90.1 (2007) as an alternative. You can take the help of checklist templates, in case you have a kind of template in mind to create the perfect checklist. REScheck Desktop for Windows may be downloaded and installed directly to your desktop. Note: REScheck Desktop only supports compliance through the 2015 IECC. When continuous foam insulation is specified, 100% of the wall is assumed to be covered at the specified R-value. 1002 Washington Ave., 3rd floor For example, if R-19 is entered as the cavity insulation R-value, it assumes the full R-19 in REScheck. endstream endobj 357 0 obj <>/Subtype/Form/Type/XObject>>stream Through legislative and/or legal procedures, jurisdictions agree and accept to adopt this provision when adopting the IECC editions and in many cases amend the adopted code to explicitly include language that expressly permits use of the COMcheck software. ALL systems in a project must meet the criteria of C406.2 and if your system(s) cannot be found in C406.2 then by default it does not qualify. f /Tx BMC endstream endobj 327 0 obj <>/Subtype/Form/Type/XObject>>stream Depending upon the type of permit and work to be performed, you may establish an inspection at the time of permitting, or by calling the Inspections Department at 817-222-7730. How to create a workplace safety inspection checklist. 0 %%EOF A DIY home inspection checklist can help you examine homes to purchase during the buying process's preliminary phases. Note: The key point is not the age of the building, but whether it is registered or eligible to be registered and listed. Commercial Permits Commercial Building Construction Trailers Certificate of Occupancy Inspection and Process Overview Investigative Inspection Certificate of Occupancy Tenant Improvements How to Apply: Apply for a Permit See individual project checklists above which include fees and review timelines Espaol. When using the ASHRAE 90.1-2013 energy code, COMcheck needs to have two EnergyPlus weather files in this folder C:\ProgramData\COMcheck\eplus\weather. New buildings, remodel or conversion of existing buildings or additions to existing buildings. H23U0t.=s#0ag COMcheck-Web is accessible directly from the website without having to download and install. View a list of supported software versions for code compliance tools. 90 North William Dillard Drive suite C-109, Gilbert. Does energy code compliance need to be shown for a warehouse? A COMcheck Plan Review/Inspection checklist. REScheck also simplifies compliance determinations for building officials, plan checkers, and inspectors by allowing them to quickly determine if a low-rise residence meets the code. Alternative combinations of cavity insulation and sheathings in thicker walls can be used, provided the total wall assembly has a U-factor that is less than or equal to the appropriate climate zone construction requirements. (b) semiheated space: an enclosed space within a building that is heated by a heating system whose output capacity is greater than or equal to 3.4 Btu/h*ft2 of floor area but is not a conditioned space. Announcements. Electrical equipment should undergo quality and safety checks before operating. Project sharing will soon be more user friendly. A license is not required to obtain building permits for commercial projects. An inspection checklist, when used properly, is an assurance that a particular piece of equipment has been inspected. Permit for repairing a residential or commercial structure damaged by fire or other catastrophic event. H23U0t.=s#0ag The other 20% is assumed to be covered with plywood. (Pick up application on the 1st floor). This page contains the necessary forms and applications needed to apply for various permits and licenses. NOTE: Once these weather files are downloaded they will remain on the PC at C:\ProgramData\COMcheck\eplus\weather. f requirements of the current Indiana Energy Conservation Code (675 IAC 19-4) (COMcheck reports must be run with current software, must show passing performance and must include the accompanying Inspection Checklist Report, which must report a score of no less than 100%); the files are of a different size than anticipated. Step 2: Goals and Objectives COMcheck can be used for commercial buildings or high-rise (>3 stories) multi-family buildings. Wattage of interior light fixtures does not exceed wattage required to comply with COMcheck or Table 505.5.2 of the IECC. REScheck is appropriate for insulation and window trade-off calculations in residential detached one- and two-family buildings and multi-family buildings three stories or less in height above grade, such as apartments, condominiums, and townhouses. ENERGY EFFICIENCY AND RENEWABLE ENERGY, Forrestal Building H23U0t.=s#0ag Inspections for this program are handled by Home Ener gy Rating company, except that Section R403, entitled "Systems," of the 2015 IECC must be verified by the local construction of fice. Louvers are best treated as un-insulated portions of the wall. New Construction and Additions Checklist (Continued) . Are projects required to be completed by a registered design professional? REScheck wall materials are assumed to be plywood siding, plywood structural sheathing, and foam insulation sheathing on the framing exterior, batt insulation, wood framing, and 1/2-in. The 2009/2012 editions of the IECC (commercial provisions) do not include language explicitly describing a defined envelope trade-off compliance method. endstream endobj 330 0 obj <>/Subtype/Form/Type/XObject>>stream Before submitting your building plans for review visit the Planning and Development Department, Subdivisions Section for a development plat review. 1.68 1.68 6.6 6.6 re 1. Cavity R-Value - Enter the R-value of any insulation to be installed in the cavities between above-grade wall structural members. Download via the link at the bottom of the right sidebar. endstream endobj 337 0 obj <>/Subtype/Form/Type/XObject>>stream Further, using this checklist does not guarantee or equate to compliance with the regulations. 2. endstream endobj 347 0 obj <>/Subtype/Form/Type/XObject>>stream Walls with insulation R-values equal to or less than R-15 are modeled in REScheck as having 2x4 studs at either 16" or 24" O.C. %R How it works: If these weather files are not found at the expected location (C:\ProgramData\COMcheck\eplus\weather), COMcheck will attempt to download them. H23U0t.=s#0ag 1.68 1.68 6.6 6.6 re The expense of bringing an existing building up to code can be very costly especially if portions have to be completely rebuilt to accommodate insulation. As a workaround, we recommend that you split your basement walls so that for eachbasement wall you add a new above-grade wall to represent the above-grade area of thebasement wall. The classifications ofspaces are as follows for the purpose of determining building enveloperequirements. H23U0t.=s#0ag endstream endobj 393 0 obj <>/Subtype/Form/Type/XObject>>stream hZ{6*3]LQ$EP,]\d7k]h[,zq?c`!g7d`!mDD= ZF}0pva2)IRHE:4!~Dg#\0 >!t9C)GIHHc In COMcheck 4.0.0.3 and newer, you can now break up your VRF into two systems. 0 0 0 rg View New! COMMERCIAL PREREQUISITE CHECKLIST. Application for Modification of Sidewalks Standards. Application may be picked up from the Taps & Meters Section. 2017 Washington DC Energy Conservation Code is now supported, Slab on grade tradeoffs no longer allowed in RES, Massachusetts State Energy Code no longer supported (as of version 4.7.2.1), State Energy Codes: Florida (2017), Massachusetts, New York City, DC, Denver, Puerto Rico, Utah (2012), Vermont. specific applicable inspections prior to obtaining a Certificate of Occupancy. %R@PBL1X Kh During Tree Inspection. DOE has published guidance surrounding its support for the software, including technical assistance requests for modified versions. RES check and COM check are based on the most recent editions of the model codes. How is Cavity and Continuous Wall Insulation Calculated in REScheck? endstream endobj 376 0 obj <>/Subtype/Form/Type/XObject>>stream Data filename: S:\2014\Jobs\014-013 DCG-Vehicle Maintenance Facility Expansion\Calcs\HVAC\COMcheck\DCG Mechanical COMchedk.cck Page 1 of 2 COMcheck Software Version 3.9.4 Mechanical Compliance Certificate 2012 IECC . 0 0 0 rg 1.68 1.68 6.6 6.6 re Please review the user guide for step-by-step instructions or watch our how-to videos: See our flowchart of astandard Commercial Plan Review process. A demolition permit is required for the demolition of any commercial structure or building within the City of Houston. endstream endobj 388 0 obj <>/Subtype/Form/Type/XObject>>stream wall: that portion of the building envelope, including opaquearea and fenestration, that is vertical or tilted at an angle of 60degrees from horizontal or greater. Insulation installed between structural members such as wood studs, metal framing, and Z-clips. This code shall regulate the design and construction of buildings for the effective use and conservation of energy over the useful life of each building. ]bO>2Is(?4olPl;c:}q9MUDF'Sontl,Q0PM5l=C5N Um20u kE00[ aP1p$P0* DHD[x&bu6LXrrA| If that doesnt work, use the web tool which requires no download but you will want to register so you can save your projects. endstream endobj 321 0 obj <>/Metadata 98 0 R/Pages 318 0 R/StructTreeRoot 143 0 R/Type/Catalog/ViewerPreferences 418 0 R>> endobj 322 0 obj <>/MediaBox[0 0 612 792]/Parent 318 0 R/Resources<>/Font<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI]/XObject<>>>/Rotate 0/StructParents 0/Tabs/S/Type/Page>> endobj 323 0 obj <>/Subtype/Form/Type/XObject>>stream %R@PBL1X Kh Continuous insulation is continuous over framing members or furring strips and is free of significant thermal bridging. endstream endobj 386 0 obj <>/Subtype/Form/Type/XObject>>stream Four (4) copies of a site plan, drawn to a scale not less than 1' = 20', showing the size and location of the new construction, with accurate boundary lines, distances from lot lines, and the established street grades and proposed finish grades. How can a COMcheck-Web or REScheck-Web project be shared with other team members? endstream endobj 351 0 obj <>/Subtype/Form/Type/XObject>>stream Does my building need to comply with the energy code if it will not be cooled or heated? COMcheck Desktop for Windows may be downloaded and installed directly to your desktop. COMcheck is the U.S. Department of Energy commercial energy compliance software tool that determines whether a new commercial building, high-rise residential building, commercial building addition or alteration meets the requirements of IECC prescriptive based paths or ASHRAE Standard 90.1. Project Type New Construction Addition Alterations Project Details (optional) Edit Project Details This information will appear on the compliance report. H23U0t.=s#0ag The UA that would result from a building conforming to the code requirements is compared against the UA for your building. Check with the building official where the project is located to confirm the city selected will be acceptable or if choosing county as the designation would be more appropriate. Commercial Buildings Inspection Checklists: Grading: Grading Checklist: Rough: Rough Checklist: Finish: Finish Checklist: Footing: Footing Checklist: FAQs. Plan Review. Software inspection processes generally call for Checklist simply to provide reviewers with hints and some recommendations for determining and identifying defects during inspection of software product. Consequently, for compliance with Standard 90.1, door U-factors must be: Both the NFRC 100 and the Section A7.1 values are for the overall door area, including the door slab and the door frame. Learn how to be a member of our team! %R@PBL1X Kh Consider your work environment. 2022 New York City Plumbing Code. All NFRC ratings are based on the whole product, including the frame.. A plumbing permit is required forCommercial dryer installation. All supporting documents for these paths can be accessed from the Tools and Reference Materials section at the bottom of this webpage. H23U0t.=s#0ag That is, when complying with IECC and the WWR and SRR values are found to be noncompliant the user will be directed to use the equivalent ASHRAE 90.1 energy code. This kind of clause is often referred to as a "deemed to comply" approach. 1.68 1.68 6.6 6.6 re endstream endobj 343 0 obj <>/Subtype/Form/Type/XObject>>stream When determining compliance to one of the IECC codes the minimum skylight requirement will be enforced through the envelope report inspection checklist and the WWR and SRR requirements will be enforced prescriptively. Show. Building Energy Codes Program is a resource of the U.S. Department of Energy's Building Technologies Office. 0 0 0 rg The web tool is definitely the way to go when you have multiple contractors involved as you can create a generic log in and each contractor can work on the same project file to enter their information (e.g., building envelope, lighting, mechanical). endstream endobj 334 0 obj <>/Subtype/Form/Type/XObject>>stream Designated team members are responsible for specific activities . Brochure for Building Plan Review and Inspection Under Wisconsin's Commercial Building and Heating Codes . Please check back here regularly for updates and announcements concerning the State Fire Marshal's Plan Review section. Yes, in Section 402.4 of the 2012 IECC, testing is now required instead of an option between testing or visual inspection such as in the 2009 IECC. Within COMcheck, a user is required to choose the code option of "2015 IECC" unless 2015 IECC section C401.2 Item 1 is applied which would then allow the application of ASHRAE 90.1-2013, in which case . %R@PBL1X Kh (1x3X20i X `1eaDbcKJPs!,=0x0.*))91fd``3plY~7iI;SR'N:gi&59{akCO/oW7wG'g[;{K+kS3sC#c]=} M-mU5uE%eY9y I)iQ1qA!a^>~N.nV6vf&cSi&p00yAp G9 2. heated space: an enclosed space within a building that is heated by aheating system whose output capacity relative to the floor area is greater than or equal to the criteria in Table 3.1. HoustonPermittingCenter.org 1 . @:#O`2,Ki$ @EBHDCDG{$jH$4>d !REh^cA`9 This may mean more insulation on the rest of the wall, better windows, or more roof insulation. Limited Technical Assistance notice: User support for the Building Energy Codes Program will be unavailable from December 23 through January 2, 2023. As noted above, ASHRAE 90.1-2013 and 2015 IECC energy codes are exceptions to all of this discussion. %R Can I share my saved lighting fixture library on another computer? %%EOF Jeff Gutknecht is committed to providing a better style of performing the TDLR (Texas Department of Licensing and Regulation) PLAN REVIEWS. In the IECC, Section C103.1 Construction Documents, General, the wording states that construction documentation and other supporting data shall be submitted in one or more sets with each application for a permit. H23U0t.=s#0ag This process is done in conjunction with other related trades with the Mecklenburg County Land Use and Environmental Services Agency (LUESA). INSTRUCTIONS: Complete this checklist, upload and submit it electronically (along with the rest of the plans) via ProjectDox. %R Box 40 Chesterfield , VA 23832-0040 Phone: (804) 748-1057 Fax: (804) 717-6080 Internet: chesterfield.gov . Were the provisions for air leakage changed in 2012 IECC compared to 2009 IECC? Whether you go to the factory yourself to check the quality of your products or hire a third-party QC company to do so, the checklist tells the inspector what to look for. H23U0t.=s#0ag Complies? hb```g``~$^30 Pc3Y0gK4ySOX4!muVla+;JK*2*2kss[6^8w&C8U ;p00 q@,2A|AD'Y*bU{Fu~)n`? Within COMcheck, a user is required to . K B:0Bhwb9,kz&.Y/.Y;@hggk7L.%ATgI5Am}r (c) unconditioned space: an enclosed space within a building that is not a conditioned space or a semiheated space. This includes above- andbelow-grade walls, between floor spandrels, peripheral edgesof floors, and foundation walls. Document Name. Section # & Req. 5.5, Prescriptive Building Envelope Option, provided that. Also, the air leakage rates changed. But if there are certain areas of a workplace or specific activities that are high risk or changing rapidly, more frequent inspection may be justified, for example on a construction project. endstream endobj 355 0 obj <>/Subtype/Form/Type/XObject>>stream 0 0 0 rg Electric central furnace does not qualify for the High Performance HVAC efficiency package. H23U0t.=s#0ag H23U0t.=s#0ag The Site Plan shall clearly show: Legal description Intended use of land Physical address Flood zone City zoning use, area district and overlay (if applicable) of project site. (depending upon the assembly). If insulated sheathing is used, only 80% of the net wall is assumed to be covered by the insulated sheathing. Page 1 of 6 Inspection Checklist Residential Mechanical Final July 2016 This Inspection Checklist reflects code requirements of the 2015 International Residential Code (IRC), 2015 Uniform Plumbing Code (UPC), and 2015 Washington State . REScheck-Web Version 2.1.0, September 14, 2021 releaseaddresses the following: REScheck Desktop Version 4.7.2 addresses the following: OFFICE of 2009 IECC and 90.1-2007 are 2 of them. Education. House inspection is an all-inclusive and comprehensive form of examination of a home using a house inspection checklist. endstream endobj 358 0 obj <>/Subtype/Form/Type/XObject>>stream One option is to share the log in credentials with them and save all edits to the project under that account. %R endstream endobj 383 0 obj <>/Subtype/Form/Type/XObject>>stream endstream endobj 364 0 obj <>/Subtype/Form/Type/XObject>>stream %R@PBL1X Kh 785 0 obj <> endobj It is installed on the interior, exterior, or is integral to any opaque surface of the building envelope. H23U0t.=s#0ag endstream endobj 382 0 obj <>/Subtype/Form/Type/XObject>>stream ASHRAE 90.1-2010/90.1-2013 5.1.2.4. 4. about Additional Commercial Structural Permit, about Ball Park/Parking Light Pole Permit, about Commercial dryer installation permit, about Commercial Fire Damage Repair Permit, about Commercial oven installation permit. H23U0t.=s#0ag All exterior walls are assumed to be of regular rectangular shape with an average wall height of 9 ft., and the wall width is calculated from the gross area as input by the user. Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software H23U0t.=s#0ag endstream endobj 373 0 obj <>/Subtype/Form/Type/XObject>>stream 0 0 0 rg NECB (10.2.2.3.) Locate the lighting fixture library in this location defaulted by COMcheck: Copy fixtureLibrary.xml from this location to the same directory on the other computer. And the system efficiency is also not enforced as there is no efficiency requirement for this part of the VRF system. Alex Marshall 2 months ago. Q5. Commercial plan review is required if you are in the corporate city limits of Houston and are planning to erect a commercial building or structure, or are adding to existing commercial building or structures. COMcheck is a nationally recognized software program to show compliance for International Energy Code Compliance for commercial building projects. endstream endobj 346 0 obj <>/Subtype/Form/Type/XObject>>stream When determining compliance to one of the ASHRAE 90.1 energy codes, COMcheck will enforce the WWR and SRR per guidance from Appendix C. However, the minimum skylight area requirement as described in Appendix C is worded and interpreted in such a way as to be deemed not applicable therefore is not enforced in COMcheck for either 90.1 or IECC energy codes. ), Once logged in, the Upload feature is available by clicking My Projects (upper right area of screen), then at the bottom of the popup window click the "Upload project from my computer" hyperlink. f The REScheck product group makes it fast and easy for builders, designers, and contractors to determine whether new homes, additions, and alterations meet the requirements of the IECC or a number of state energy codes. %R@PBL1X Kh Step 1: Choose a Checklist Template Firstly, choose a template that you think is the perfect fit for the kind of checklist you are creating. TheDOE-2 simulation program used in REScheck for performance alternative calculations sometimes generates this error even though the entries appear valid. endstream endobj 394 0 obj <>/Subtype/Form/Type/XObject>>stream COMcheck-Web - 2009 IECC Code/Location Code: State: City: If your location is not included here, choose a nearby location with similar weather conditions. Effective October 1, 2002, Florida law authorizes fee owners to elect to use private providers to review plans and inspect construction for compliance with the Florida Building Code and Local Amendments. Law allows building departments to check plans reviewed by private providers and to inspect . What is considered a residential building? Services. %R@PBL1X Kh How does the importing of a gbxml file option function? 0 0 0 rg COMcheck will do the area-weighted averaging for the opaque wall to calculate the overall U of the opaque wall. Table: Checklist for Visual Inspection of Concrete Structure. REScheck works by performing a simple U-factor x Area (UA) calculation for each building assembly to determine the overall UA of a building. COMcheck that matches the edition of the New York City Energy Conservation Code or ASHRAE 90.1 in effect when the application was filed. Additionally, it is advised that you visit the Taps & Meters Section to ensure there is available water and wastewater for your project. 0 0 0 rg 0 0 0 rg However, reports submitted are frequently incomplete. endstream endobj 325 0 obj <>/Subtype/Form/Type/XObject>>stream H23U0t.=s#0ag ENERGY EFFICIENCY AND RENEWABLE ENERGY, Forrestal Building Building commissioning is a team effort that requires the involvement of numerous stakeholders in the process of delivering a successful building project. Download via the link at the bottom of the right sidebar. %R@PBL1X Kh H23U0t.=s#0ag Insulation that runs continuously over structural members and is free of significant thermal bridging; such as rigid foam insulation above the ceiling deck. Help Desk inquiries submitted during this time will be answered the first week of January. endstream endobj 335 0 obj <>/Subtype/Form/Type/XObject>>stream endstream endobj 359 0 obj <>/Subtype/Form/Type/XObject>>stream endstream endobj 339 0 obj <>/Subtype/Form/Type/XObject>>stream is placed on the exterior side of the framing. These are part of the routine checkup when you bring your car to an inspector. Obviously for this process to work the current user must have user privileges that permit COMcheck to establish an internet connection and to download these files. ), Development plat approval from the Department of Planning & Development. A plumbing permit is required for aCommercial oven installation. Navigate to the file on your PC and when selected click Upload. Download a copy of the presentation slides and watch the recording of the workshop: For questions, please contact Commercial Plan Review, 832.394.8810 or email [emailprotected]. Choose a city that is the closest with the most similar weather. endstream endobj 349 0 obj <>/Subtype/Form/Type/XObject>>stream (on center) and cavity wall insulation R-values greater than R-15 are modeled as 2x6 studs at either 16 or 24 O.C. Because your team completes these inspections every single day, it's easy to become complacent and start going through the motions. For concrete/masonry fences or any fence over 8 feet in height on a commercial property. Continuous R-Value - Enter the R-value of any continuous insulation in the above-grade wall. We provide both Residential and Commercial services. How does COMcheck calculate percentage of glazing? For example, if R-19 is entered as the cavity insulation R-value, it assumes the full R-19 in REScheck. endstream endobj 374 0 obj <>/Subtype/Form/Type/XObject>>stream The ZEBP path aligns with BC's Energy Step Code and uses the City of Vancouver Energy Modelling Guidelines while following NECB's Part 8 instructions for the proposed building's performance model. 1.68 1.68 6.6 6.6 re f The program does not calculate for compression. As such, the Louisiana State Uniform Construction Code Council (LSUCCC) has adopted the 2015 editions of the I-codes. The bottom line from a strict 90.1 and IECC perspective is that if the U-factor is not developed using NFRC 100, the default values in Standard 90.1 must be used. 472 0 obj <>stream Where special conditions exist, the code official is authorized to require necessary construction documents to be prepared by a registered design professional. endstream endobj 392 0 obj <>/Subtype/Form/Type/XObject>>stream Purpose of Section 503: hbbd```b``+@$#,D2,`5>qF8s`808~|&azLjHxgfk I6pz`T 2! 1.68 1.68 6.6 6.6 re 0 0 0 rg (Click here for more information.) These defaults are available in COMcheck and can be used. International Energy Conservation Code (IECC). endstream endobj 397 0 obj <>/Subtype/Form/Type/XObject>>stream f hb```g`` B@16&lO4^Y&y5@E& i endstream endobj 336 0 obj <>/Subtype/Form/Type/XObject>>stream %PDF-1.6 % endstream endobj 375 0 obj <>/Subtype/Form/Type/XObject>>stream Next is the applicable energy code. To help the development community adjust to the new procedure, Building Code Enforcement hosted an online workshop to explain the: Inspection checklist which follows the compliance certificates; Importance of the comment section Mechanics must be certified to perform Annual Vehicle Inspections. H23U0t.=s#0ag Have a compliance question or need assistance with the software? If you select this as your system the capacity of individual units will generally be so small that the economizer requirement will not be enforced. COMcheck input for uninsulated balconies on page BE-11 of the Supporting Documents How-To Guide. Since 2016, a COMcheck report has been required on all commercial plan reviews. The other VRF system you would specify is from the cooling equipment side of the HVAC systems dialog and is called "VRF Zone Fan Unit". assigned the default values in Section A7.1. H23U0t.=s#0ag ASHRAE offers an exception tothe 40% limitation that calculates the partial shading provided by permanent opaque projections (Refer to ASHRAE 90.1-2007 Sections 5.5.4.2.1 and 5.5.4.4.1, Exception (b)).